- Version
- Download 16
- File Size 180 KB
- File Count 1
- Create Date October 5, 2021
- Last Updated October 5, 2021
D7.1 Integrated mock-up scenario (demonstrator) for system optimization - ABSTRACT
This document is a first output of the Task T7.1 System optimization through mock-up pilot scenario, led by EURECAT, within the Work Package WP7 Demonstrator integration, test and validation, led by STAM. This document provides a comprehensive description of the mock-ups being developed within the SHAREWORK project. There will be four mock-ups, one for each use-case, being developed at the facilities of the corresponding technical coach. They are to serve as a preliminary benchmark for the modules developed in the SHAREWORK project, prior to their integration in the final demonstrator that will be validated in the end-user installations by real operators. This document reports, then, the final design of these mock-ups.