- Version
- Download 7
- File Size 184.18 KB
- File Count 1
- Create Date October 27, 2022
- Last Updated October 27, 2022
D7.4 Report of validation tests of UC#1 to UC#4 demonstrator - ABSTRACT
This deliverable concludes the activities performed during Task T7.3 “Validation test campaigns on real demonstrators”, led by SEAT, within the Work Package WP7 “Industrial Demonstrators integration”, led by STAM. This document provides a description of the validation test campaigns performed within the Sharework project, which have the goal of preliminary addressing the requirements identified in WP1 “System conceptualization, use case definition and modelling” and applying to the system any tuning that is required.
Firstly, this deliverable reports an update about the integration of the four demonstrators in the industrial environment. Then the validation tests of each demonstrator are presented, describing the methodology of the tests and the results obtained.